Phase 2 Clubhouse Renovation

This week the GCM staff completed, with the exception of installing the new bag stand,  Phase 2 of the clubhouse renovation master plan. Phase 2 included removing all the existing plant material, reshaping the land, installing drainage lines, installing drip irrigation/flower irrigation, dry creek bed, new plant installation, and clubhouse lighting. The project was topped off with a fresh application of mulch and we will be creating the bag stand concrete pad and ordering the new bag stand this week. Phase 2 plant materials consisted of similar plants chosen in Phase 1 on the left side of the clubhouse, Nellie R. Stevens Hollies, Lime Light Hydrangea, Green Velvet Boxwoods, Carpet Roses, and Otto Luyken Laurels.

Phase 2 Before

Phase 2 Before

Phase 2 After

Phase 2 After

Phase 2 After

Phase 2

Phase 2

During Phase 2, we also took this opportunity to begin a small part of Phase 3, which included the Golf Shop entrance door. Phase 3 will be an ongoing process in 2014 extending around to the rear of the clubhouse as the renovation of the back patio is completed.

Phase 3 Golf Shop Entrance

Phase 3 Golf Shop Entrance

This entry was posted in Annuals, Miscellaneous and tagged , . Bookmark the permalink.